| Rig Type |
Jackup |
| Rig Location |
Mexico |
| Rig Design |
Levingston 111 IC |
| Year Built |
1976 |
| Yard Built |
Levingston, Port Arthur, TX |
| Class |
ABS |
| Registry |
US |
| Water Depth - Ft |
300 |
| Drilling Depth - Ft |
30,000 |
| Quarters |
72 + 4 bed hospital |
| Dimensions |
208' x 178' x 23' |
| Helideck |
66' x 62' for Sikorsky S-61 |
| Variable Deckload - Operating |
3,946 kips |
| Variable Deckload - Transit |
3,000 kips |
| Number of Legs |
3 |
| Leg Length |
410' |
| Usable Leg Below Hull |
354' |
| Spud Can Diameter |
48' |
| Cantilever Reach |
45' |
| Transverse Movement |
12' port or starboard of centerline |
| Max Combined Structure Load |
1,600 kips |
| Bulk Mud & Cement |
6,000 cu ft |
| Liquid Mud |
1,591 bbls |
| Fuel Oil |
4,132 bbls |
| Drill Water |
8,665 bbls |
| Potable Water |
903 bbls |
| Sack Storage |
2,000 sacks |
| Drawworks |
Oilwell E-3000 w/1-1/2" drill line
|
| Derrick |
Emsco 30' x 30' x 160', 1,400 kips gross nominal capacity
|
| Top Drive |
Varco TDS-3 w/PH60 pipe handler
|
| Pipe Handling System |
Varco IR-2000 Iron Roughneck |
| Rotary |
Oilwell A-375, 37-1/2" |
| Top of Rotary Table to Bottom of Barge |
62 Ft. |
| Mud Pumps |
(2) Oilwell A1700-PT |
| Main Engines |
(2) EMD 16-645-E8, (1) EMD 12-645-E8 |
| Annular BOP |
(1) Shaffer 13-5/8" 5K |
| Ram BOP |
Cameron Type U (single & double) 13-5/8" 10K
|
| Diverter |
Hydril MSP 21-1/4" |
| Solids Control |
(1) Brandt dual tandem, (2) Derrick Flo-Line Cleaners, Cascade system |
| Cranes |
(1) Sea King 62 w/100' boom, (1) SeaTrax 6020 w/120' boom |
|
|